Flowage

Flowage provides a little bit of everything with fast and flowy downhill sections, a few uphill climbs, optional drops and jumps, and some technical bits as well. A major rebuild was done on the first section in 2021 and a portion of the middle section in 2022. This trail is scheduled for another major rebuild in 2026. While every other trail at WinMan is accessible via one of our major hubs, this trail is only accessible via WinMan One and is the only way to access Perimeter Trail or Lake Trail.
| Difficult Rating | Blue |
| Length | 1.7 miles |
| Adaptive Bike Friendly | No |
| Groomed for Winter Fat Tire Biking | Yes |
| Original Build Date | 2013 |
| Last Major Rebuild or Redesign | 2022 |